Mixing and mixing coefficient
integrated technique of indoor work and field work
integration of Indoor work and field work
maximum difference work between plus and minus work
stay at a selected grass-roots unit to help improve its work and gain firsthand experience for guiding overall work
work center capacity report-by work center
work center load analysis by work center
work list by work center
work system of work safety
(average)φ-mixing random sequences
(The symbol is abbreviated) mixing
(The Symbol is abbreviated) mixing random sequence
(The Symbol is abbreviated)-mixing
(The Symbol is abbreviated)-mixing random sequence
(The symbol is abbreviated)-mixing sequence
2D NOESY mixing coefficient
2D NOESY mixing coefficient matrix
3-D compressible mixing layer